High Voltage Testing and Asset Management Laboratory
ห้องปฏิบัติการไฟฟ้าแรงสูง

Department EPE, ESSE
Location HV Lab, TGGS Building
Supervisors Assoc. Prof. Dr. -Ing. Thanapong Suwanasri
Tools/Services • STEP compact(Step voltage test controller)
• HV control(HV test control unit)
• PZT100-0.1(Single phase AC voltage test transformer), 2x220Kv/100kV/220V, 5kVA
• GS(HV diode), 140kV/20mA
• RE : Parallel(Wave tail) resistor, 2.4kW/140kV
• CS : Smoothing and energy storage capacitor, 25000pF/140kV
• CB : Load capacitor, 1200pF/140kV
• RD : Series(wave front) resistor, 375W/140kV
• CM : Measuring capacitor, 100pF/100kV
• RM : Measuring resistor, 280MW/140kV
• ES : grounding switch,140kV(24V,50/60Hz)
• EST : Discharge and grounding rod(Discharge resistance : 100W)
• EB : Grounding foil
• EL : Electrode(Diameter:300mm)
• IS : Insulating support : Acmax 100kV, DCmax and IMPmax 140kV
• KF : Sphere gap : IMPmax 140kV, Spherediameter 100mm
• AKF : Drive for sphere gap
• AKF Cable
• V : Connecting rod
• K : Connecting cup
• F(s) : Floot pedestal
• D : Spacer bar
• NTZ : Secondary part for CB(Impulse)
• SEK AC : Secondary part for CM(AC), 68nF
• SEK DC : Secondary part for RM(DC), 15kW
• MK BNC : Impedance 75W, Standard length 10m
• EZK : Electronic trigger sphere
• EZK Cable
• ES Control : Grounding switch(24V,50/60Hz)
• KF Control : Sphere gap control(IMPmax 140kV, Spherediameter 100mm)
• EZK Control : Electronic trigger sphere